Roller- or Brush-Applied Epoxy (Epoxy Coating)

Home / Products / Roller- or Brush-Applied Epoxy (Epoxy Coating)
DMHEPOXY COATING
Brand: DMHModel: Epoxy CoatingSize: 20 kg/set

Roller- or Brush-Applied Epoxy (Epoxy Coating)

A floor-coating system, two-part (Epoxy Resin + Hardener), which is strong and durable, and suitable for coating indoor surfaces such as factory floors, warehouse floors, indoor car parks and cold rooms.

  • High durability — resists impact, scratches and chemicals
  • Smooth, glossy surface — a glossy or semi-gloss, smooth, clean-looking finish
  • Excellent adhesion — bonds firmly to concrete floors
  • Easy to clean — ideal for high-hygiene areas such as canteens and production rooms
  • Easy to roll on — apply with a roller, no spray equipment needed

Sold in 20 kg sets (A 16.5 kg : B 3.5 kg) · installation available nationwide

Product details

Roller-applied epoxy floor coating, EPOXY COATING SERIES-5, is a solvent-based two-part epoxy for dust-proofing floors, sealing pores and giving a durable finish with good chemical and moisture resistance. It can be used on many surfaces such as steel, machinery and concrete; prime the concrete before the topcoat for a glossy finish.

Key features: excellent adhesion to both old and new floors, high gloss, good penetration, crack coverage, chemical and abrasion resistance, easy application by roller, brush or spray, and easy maintenance.

Roller-applied epoxy system

  1. Epoxy Primer (base coat)Improves adhesion between the concrete and the topcoat, and penetrates to seal the floor's pores
  2. Epoxy Top CoatApplied in 2–3 coats by roller, with a wide choice of colours such as grey, green, light blue, blue and red

Technical data

Solids content80 ± 1%
Specific gravity1.35 ± 0.20
ColourPer catalogue (gloss)
Wet film thickness100 micron
Dry film thickness80 micron
Pot life (after mixing)60 minutes
Pack size20 Kg/set (A 16.5 Kg : B 3.5 Kg)
Touch-dry time4–5 hours
Cure time24 hours
Full cure7 days (tested at 25°C)

Mechanical test values

Compressive Strength735.70 kgf/cm²
Flexural Strength421.44 kgf/cm²
Tensile Strength251.22 kgf/cm²
Bond Strength206.29 kgf/cm²
Abrasion Resistance50 mg loss / 1000 cycles (H17, 1 Kg load)
Shore D79
Adhesive Strength> 3,500 psi
Water PermeabilityImpermeable (waterproof)

Surface preparation & application

Surface preparation

  • The concrete must be dry, sound and clean — free of dust, oil and grease
  • New concrete must be at least 28 days old before coating
  • On steel, remove rust and loose material with a wire brush, grinding disc or sandblasting
  • For greasy surfaces, wash with a degreaser then prime immediately to prevent rust

Application method

  • Pour the Hardener (B) into the container of part (A)
  • Stir with a low-speed drill and mixing paddle for at least 1 minute until fully combined
  • Roll the Epoxy Coating onto the prepared floor with a roller or brush
  • Tools: paint roller, mixing tray, steel trowel, floor grinder

Suitable surfaces & precautions

Suitable surfaces

  • Fully dry concrete with no rising damp from below
  • Heavy-use areas such as warehouses, factories and indoor car parks
  • Steel surfaces and machinery needing extra durability

Precautions

  • Do not use outdoors (sunlight causes yellowing/degradation)
  • Do not apply over high-moisture floors (causes blistering/peeling)
  • Mix the two parts in the correct ratio and use within the pot life (60 minutes)
  • Wear protective equipment, work in a ventilated area and keep away from heat

Storage: 12-month shelf life in a sealed container, kept in the shade and dry · Chemical resistance: 10% hydrochloric acid, 25% sulfuric acid, 5% acetic acid, 10% citric acid, fuel and oils

Related

Recommended products

Interested in Epoxy Coating or need advice on a floor system?

Ask about specs, coverage and pricing for free — buy by the set or have us install the complete system, nationwide.

Q&A

Frequently asked questions

Frequently asked questions about Epoxy Coating

Can Epoxy Coating be used outdoors?
Not recommended outdoors, because sunlight (UV) causes yellowing and degradation. It suits indoor floors such as factories, warehouses and indoor car parks.
How long must new concrete cure before applying epoxy?
New concrete should be at least 28 days old, and the floor must be dry and clean — free of dust and oil — before coating.
What is the pack size and drying time?
The pack size is 20 kg/set (A 16.5 kg : B 3.5 kg); touch-dry in 4–5 hours, hardens in 24 hours and fully cures in 7 days (at 25°C).
How do I order or request a quotation?
Contact us on LINE @dmhgroups or call 083-805-2305. Our team will advise on specs, coverage and pricing for free, with nationwide installation service.

Not sure whether your floor needs epoxy or another system? See the full comparison at Concrete floor coatings: which system to choose — acrylic, epoxy or PU — or see the overview of all three epoxy flooring systems

×Enlarged image
Epoxy coating by DMH Groups
DMH Groups network sitesDMH Groups (main site)DMH Sport Floor · sports courtsOur installations